Port Blair, Oct 14: M/s. Suryachakra Power Corporation Ltd., 20 MW Power Plant, Bambooflat will carry out urgent maintenance of its DG Set No. 4 on Oct 15, 2015. Due to the maintenance, the Electricity Department may carry out 45 minutes rotational load shedding in Port Blair and South Andaman area on Oct 15-16, 2015 between 5 pm to 9.30 pm on as and when required basis.