Port Blair, Dec 9: Power supply will remain suspended at Dairy Farm Junction, Lamba Line, Ranchi Tekery, School Line complete & part of Minnie Bay on Dec 10, 2015 from 7.30 am to 2 pm and at Caryn’s Cove Chowk and adjacent area from 7.30 am to 2 pm on Dec 11, 2015 in connection with repairing of water pipe line opposite to VKV School gate, Lamba Line and Carbyn’s Cove Chowk by APWD. In a release, the Executive Engineer (HQ), Electricity Department has regretted the inconvenience caused to consumers.