Port Blair, Dec 04: It is brought to the notice of general public and government departments that the repairing of HDPE pipeline of 20 MW IPP Power House, Bambooflat will be carried out on 06.12.2014. Due to this, if required one hour rotational load shedding will be carried out in Port Blair and South Andaman area on 06.12.2014 from 0800 hrs to 1600 hrs.