Port Blair, Apr 11: It is brought to the notice of the general consumers and Government departments that M/s. Powergrid Corporation of India Ltd., will carry out commissioning of over head line erected on 66 KV tower for replacing existing 33 KV line in inundated portion from Junglebari to Dandus Point on 12.04.2014. Due to this work, if required, there shall be one hour rotational load shedding in Port Blair and South Andaman area on 12.04.2014 from 0900 hours to 1600 hours on as and when required basis.