Rabindranath Biswas
Uttara/Diglipur, Nov. 28: Shri Prakash Mondal, Pradhan, Gram Panchayat Uttara has pressed for early commencement of the work namely: “Re-Alignment of PPR pipe line for length of 2.90 km from old APWD CC Weir camp No.10 to main road NH-4 near Kallu Nallah Bridge (Phase-I)” by APWD, Kadamtala.
According to information, the existing pipeline infrastructure has been experiencing frequent breakdowns leading to severe water scarcity and improper drainage for the last twenty years in areas such as Uttara, Shantanu and Kadamtala. And as a result of which, the residents of these areas have been facing severe inconveniences, the Pradhan said.
The Pradhan, realizing the exigency and gravity of the situation, has reportedly written a letter to the Chief Secretary, A & N Administration, Sri Vijaya Puram on 25th November 2024 apprising the authority of the sufferings of the residents owing to the old and damaged pipeline which often reportedly conks out, and the exigency of executing the pipeline work without further delay so as to alleviate the sufferings of the residents and also to ensure a safe and reliable water and sewage system, the Pradhan emphasized.
Accomplishment of the pipeline infrastructure will undeniably improve the living conditions of the residents of Uttara, Shantanu and Kadamtala, while incidental problems may also be arrested, the Pradhan further opined.
Leave a Reply