March 7, 2026

1 thought on “BJP demands feasibility study for Bambooflat Bridge

  1. Excellent! This is the need of the hour. The traffic in the subject route has increased multifold and needs to addressed ASAP. [1] Critical patients from Bambooflat CHC, Wimberlygunj PHC could be evacuated on time saving precious life. [2] The rate of several essential commodities in this part would become at par with Aberdeen.
    DSS has its limitation of running vehicle in single landing slip areas on both sides. The capital for making additional slip areas could be utilised for this bridge project. People would be able to commute even in adverse weather conditions which is not possible at present as recently witnessed during cyclone “Thane”.

Leave a Reply

Your email address will not be published. Required fields are marked *